St Mary’s Island, Chatham, Kent
Woodrush Place
Conservatory piled slab foundation
A typical foundation edge detail for a proposed conservatory shows a reinforced concrete slab supported by a pile, together with the cavity wall, insulation and damp-proofing junctions.
A selected project from our surveyors’ wider party wall experience.

Drawings are shown as presentation excerpts of the proposals.
← Back to all case studies
Part of the Murus network 