Notices & responses
When do I need a party wall notice?
Understand which works may need notice, who should receive it and when to start the process.
A valid notice needs the correct owners, a clear description and the right lead-in period. One project can need more than one type of notice.
Start with the proposed work
A party wall notice is formal notification of work covered by the Party Wall etc. Act 1996. It is not planning permission and it is not an Award. The Act applies in England and Wales and can cover work to shared structures, new walls at a boundary and certain nearby excavations. Ordinary decorating or putting up shelves will not usually need notice; cutting into a shared wall for structural support is a different matter.
Allow the right amount of time
Work to an existing party structure normally needs at least two months’ notice. Notices for a new wall at the boundary or qualifying excavation normally require at least one month. An adjoining owner can agree to an earlier start, but that agreement should be recorded in writing. A reply within 14 days is not the same thing as the notice period expiring. If a dispute needs an Award, allow time for that process too.
Identify the owners and describe the work
There may be more than one adjoining owner, including freeholders and qualifying leaseholders. A notice needs the correct parties, an adequate description of the work and the proposed start date. Excavation notices also need plans and sections. You can serve notices yourself, but errors in ownership or the description can cause delay.
What to send us
Send the property address, drawings, intended start date and any ownership information you already have. We can assess the notices needed and confirm the fee. Our £25 including VAT notice service includes up to two notices; additional notices are £10 including VAT each. Land Registry searches are separate, or you can supply the required documents.
General guidance for England and Wales, rather than a determination of an individual case. Legal points reviewed on 27 October 2026.