A party wall Award: what to check before work starts
Understand the document, its drawings and the practical arrangements for the build.
Read the Award with the documents it incorporates. Your builder needs to understand the relevant requirements before carrying out the work.
Know what the document determines
An Award resolves relevant matters in dispute under the Act. It can address the right to do the work, the time and manner of execution and associated costs. It is different from a planning approval, building contract or general promise between neighbours. Read the actual scope rather than assuming it authorises every operation shown somewhere in the project file.
Check the drawings and conditions together
Match the listed drawing numbers and revisions to the builder’s set. Identify any requirements relating to access, protection, working arrangements, inspection or records. Ask about unclear wording before the affected operation starts. A condition that is buried in an attachment still needs to be understood by the people organising the work.
Manage changes through the right route
An Award does not give the contractor permission to improvise changes affecting the statutory works. Tell the surveyor if opening up, a design revision or the proposed sequence changes the position. The appropriate response may depend on the scale of the change and the existing documents. Record any further determination or agreement properly rather than relying on a verbal message passed through the builder.
Keep the final record
Retain the served Award, incorporated drawings, condition record and subsequent agreed documents with the property information. If you believe the Award itself is wrong, obtain legal advice promptly about the 14-day appeal period from service. Asking for an explanation is sensible, but should not be assumed to extend the time available to challenge it.
General guidance for England and Wales, rather than a determination of an individual case. Legal points reviewed on 27 October 2026.