Your project
Removing a chimney breast from a party wall
Check the shared structure and the support arrangements before demolition.
Confirm how the remaining masonry will be supported and whether the work affects a party structure before arranging demolition.
Internal work can affect a shared wall
Removing a chimney breast attached to a party wall commonly involves work covered by the Act. That can be true even when the work is entirely inside your house. A chimney on a wholly separate wall may present a different situation. The construction and the proposed method matter.
Keep structural design and party wall advice together
Your designer or structural engineer needs to establish how any remaining chimney masonry will be supported. Party wall procedures do not replace structural design or building regulations approval. Share the proposed removal extent, plans, sections and support details with the surveyor so the notified work matches what the contractor intends to do.
Allow time for your neighbour’s response
Notifiable work to an existing party structure normally needs two months’ notice. Written consent may avoid the need for an Award at that point, while a dispute leads to the statutory surveyor procedure. A friendly conversation is useful, but it is not a substitute for the required notices and written responses.
Keep the scope clear
Our Award fee for chimney removal is £350 including VAT. If additional works are included in the same Award, the total is £450 including VAT. Tell us if the removal is part of a wider loft or extension project so we can review it together. Do not assume a quotation for chimney work automatically covers every other alteration.
General guidance for England and Wales, rather than a determination of an individual case. Legal points reviewed on 27 October 2026.
Sources: Act section 2, Act section 3, Act section 7, Act section 10; Government explanatory booklet. Government material is available under the Open Government Licence v3.0.
Part of the Murus network 